101 19 Street NW · WEST HILLHURST
15 décembre 2025
PassThere was no designated sanitizer solution prepared for the cappucino machine steam wand., , Provide a separate sanitizer solution to be used for wiping down the steam wand with a sanitized cloth.
Facility added baking onsite. Insufficient number of sinks onsite. (1 comp + dishwasher). Utility sink in back room, , *A 2 compartment sink is required as a backup to the dishwasher.