2001 - 1000 Tudor Glen
May 14, 2025
PassThe edges of the newly installed countertop at the 3-compartment sink area are unfinished and must be smooth, impervious-to-moisture, and easy-to-clean., , The back edge of the countertop does not connect and form a seal with the wall. Please ensure this forms a water-tight seal and caulk appropriately. , , The perimeter around the 3-compartment sink requires caulking to prevent water entry.
Baseboards are missing in some areas of the dry goods storage and the food handling areas. Ensure everywhere the wall and floor meet forms a waterproof seal.