J015 - 3625 Shaganappi Trail NW · VARSITY
16 décembre 2024
PassThe chlorine sanitizer solution in front and back preparation area was measured at 0 ppm. , , - Ensure the sanitizer solution is changed at adequate intervals. Chlorine sanitizer solutions must be used at 100 ppm.
The handwashing sink in the back preparation area was blocked with a strainer. , , - Do not use the handwashing sink for anything other than handwashing. Ensure the handwashing sink is accessible at all times.
Several flies observed in the back preparation area. , , - Implement effective measures to eliminate the presence of flies in the facility.
Some buildup observed in the hard-to-reach areas of the facility such as flooring behind equipment and under shelves in the back preparation. , - Clean and maintain in a clean and sanitary condition at all times.