526A 3 Street SE
10 avril 2026
RéussiThe LG and Hisense refrigerators are not each equipped with a thermometer.
[The countertop of the three-compartment sink cabinet is in disrepair, especially along the front edges; moreover, the particle board construction of this surface is inadequate and inappropriate.] -- YES - In Compliance , Repair work, which appears to be satisfactory, has been conducted., Two ceiling lights in the manual dishwashing room are burned out.
The ceiling ventilation fan in the washroom does not appear to be working.
Ce restaurant a été inspecté 4 fois depuis le 15 avril 2025, avec 4 réussites et 1 fermeture au dossier.
The LG and Hisense refrigerators are not each equipped with a thermometer.
[The countertop of the three-compartment sink cabinet is in disrepair, especially along the front edges; moreover, the particle board construction of this surface is inadequate and inappropriate.] -- YES - In Compliance , Repair work, which appears to be satisfactory, has been conducted., Two ceiling lights in the manual dishwashing room are burned out.
Ce dossier provient d'Alberta Health Services Environmental Public Health, qui inspecte les établissements alimentaires partout en Alberta. Les inspecteurs notent toute infraction aux règlements sanitaires applicables à chaque visite. Le résultat ci-dessus correspond à la dernière inspection au dossier.
L'Alberta enregistre chaque visite soit comme une inspection routinière (avec d'éventuelles infractions notées), soit comme un ordre de fermeture. Si vous voyez des infractions listées sans ordre de fermeture, l'exploitant a été autorisé à poursuivre ses activités tout en les corrigeant. Un ordre de fermeture signifie que l'inspecteur a exigé l'arrêt du service à la clientèle jusqu'à la correction des problèmes.
The ceiling ventilation fan in the washroom does not appear to be working.
The LG and Hisense refrigerators are not each equipped with a thermometer.
The countertop of the three-compartment sink cabinet is in disrepair, especially along the front edges; moreover, the particle board construction of this surface is inadequate and inappropriate. , Two ceiling lights in the manual dishwashing room are burned out.
The ceiling ventilation fan in the washroom does not appear to be working.
The sanitizer solution in the bucket was measured at 0 ppm chlorine. The operator promptly made a fresh bucket of sanitizer solution of 100 ppm chlorine.
The hand sink was not stocked with paper towels, and the soap dispenser was not operational. The operator promptly placed a hand soap pump and paper towels.