10303 108 Street NW · DOWNTOWN
8 janvier 2026
PassThe initial sanitizer test result was 0 ppm. During the inspection, the sanitizer solution was replaced, resulting in a concentration of 100 ppm.
Several floor tiles were observed lifting from the floor in the facility. The owner is aware of the issue and stated that repairs have been made previously; however, some of the tiles tend to lift again with seasonal changes. He further indicated that this may be due to the age of the building and unstable underlying soil, and that repairs are intended to be completed in the near future.