624 8 Avenue SW · DOWNTOWN COMMERCIAL CORE
December 9, 2025
PassDecember 9th, 2025: The floors in the walk-in cooler and freezer have been refinished. Some tiles in the kitchen are still cracked. Discussed providing the operators time to repair/refinish the kitchen floor. , , November 20th, 2025: Some tiles throughout the kitchen were cracked. , , Please replace the cracked tiles such that the floors are smooth, cleanable, and impervious to moisture.