E183 - 1600 90 Avenue SW · BAYVIEW
17 novembre 2025
Pass"Outstanding" Update February November 17th, 2025, - Only top shelf of wooden rack was rough as paint has started to peel off. , -The leakage was observed below the dishwashing area. Please repair the leakage. , , Shelves of wooden rack being used to store bakery items located in front prep area were rough as paint has peeled off., , Requirement:, -All surfaces must be smooth., Refinish the wooden rack to make surface smooth.
"Outstanding", Tape observed on the prep sink faucet in the back kitchen area. , , **Please remove the tape as it is not easy to clean. , **Ensure all surfaces in the facility are durable, non-abosrbent and easily cleanable.
The back area of the kitchen requires organization, including:, -The mop sink and chemical storage room, - The space behind the chest freezer, , Proper organization is necessary to facilitate cleaning and prevent pest harborage.