66A 8 Street NW
22 décembre 2025
ConformeAucune infraction trouvée
Ce restaurant a été inspecté 6 fois depuis le 11 juin 2025, avec 3 conformes, 3 non conformes et 1 fermeture au dossier.
There is no paper towel at the handwash sink near the food prep cooler. The operator replaces the paper towel to ensure proper hand drying.
There are scoops in the flour containers. The operator removes them to prevent cross-contamination.
Ce dossier provient d'Alberta Health Services Environmental Public Health, qui inspecte les établissements alimentaires partout en Alberta. Les inspecteurs notent toute infraction aux règlements sanitaires applicables à chaque visite. Le résultat ci-dessus correspond à la dernière inspection au dossier.
« Conforme » signifie qu'aucune infraction n'était en suspens lors de cette visite. « Non conforme » signifie qu'une ou plusieurs infractions n'ont pas été corrigées sur place. « Fermé » signifie que l'inspecteur a ordonné l'arrêt du service à la clientèle jusqu'à la correction des problèmes.
There is no quaternary ammonium sanitizer test strip available to verify the concentration of the sanitizer in the three-compartment sink used for dishwashing., , There is no bleach test strip available to verify the concentration of the bleach solution used to sanitize counter surfaces.
Thermometer is available in the walk-in cooler, but not in the freezer located near the kitchen entrance. Please ensure each cold storage unit is equipped with a thermometer for temperature monitoring.
The following construction work has been completed:, - Floor-wall joints in the facility have been sealed., - The gap in the wall by the walk-in cooler has been filled., - Wall seams have been sealed., - The hole on the wall above the power outlet by the kitchen back entrance has been filled., , The following construction work remains outstanding:, - The back door frame lacks proper finishing. The operator indicated that they would paint the frame.
Thermometers are missing in the walk-in cooler and the freezer located near the kitchen entrance. Please ensure each cold storage unit is equipped with a thermometer for temperature monitoring.
The following construction work remains outstanding:, , - Floor-wall joints in some areas of the facility are not sealed., - There is a gap in the wall by the walk-in cooler., - Some wall seams remain unsealed., - There is a hole on the wall above the power outlet by the kitchen back entrance., - Some wood surfaces (the door frame) lack proper finishing., , Please ensure these items are addressed promptly.