15163 121 Street NW · CAERNARVON
25 mars 2026
Pass1. Hallway leading to kitchen from the bar area was missing one tile and the kitchen had 3 tiles that were missing pieces. Repair or replace affected tiles by April 21, 2026, 2. Floor/ wall edge by entrance of the ice machine room was damaged. Correct by April 21, 2026., , Action Required:, Install missing tiles or repair affected floor surfaces. Repair or replace damaged floor/wall. Ensure all floor, wall and ceiling surfaces are made of material that is smooth, durable, impervious and easily cleanable to facilitate effective cleaning procedures and to prevent conditions that may promote harborage of pests., , 3. Satisfactory photo evidence showing floor tiles installed by bar stool area appearing to be in good repair, received by PHI from Operator via email on March 25, 2026