106 - 80 Sage Hill Road NW · SAGE HILL
23 avril 2025
Réussi1. The storage room wall was built with concrete and holes were noticeable on the walls. , , FRP was installed on the storage room wall., , 2. Gap was noted on the ceiling at the front service area., , The ceiling tiles were replaced.