9 - 2219 35 Avenue NE · NORTH AIRWAYS
3 février 2026
Pass1) The rubber floor coverings in the growing rooms were deteriorated and in disrepair;, 2) The concrete floor in the walk-in cooler and in the processing area was in disrepair and water was pooling on the floor., 3) The corrugated plastic was installed on the wall in the beans processing area and held by the duct tape at multiple locations., **Clean the unfinished wall surfaces of the heating room. , Replace any damaged rubber mats., Replace/repair any damaged floors., Replace/repair any damaged walls.