103 - 505 Main Street SW
18 juin 2025
Pass1. Tile baseboard by entrance to back area was missing. Replace, , 2. Edge piece was missing on particle board shelf near blenders. Repair. , , 3. Wall to the left of sink area was covered with corrugated plastic sheet. Sheet was damaged in some areas making it hard to clean. Repair or replace with more durable material. , , *Facility has renovations planned for later in the year.